RSS Feed
Subscribe

Whether you’re an engineer with a napkin sketch or a founder with a pitch deck, this end-to-end guide shows exactly how to take a product from concept to prototype in the UK—fast, cost-effectively, and with production in mind. Along the way, you’ll see how Attwood PD helps teams de-risk decisions, select the right materials and processes, and bridge the gap from one-off prototypes to small batches and full production.


1) Frame the Opportunity (Week 0–2)

Deliverables: Problem statement, success metrics, constraints, early budget/timeline.

  • Define the job to be done: What specific task should the product accomplish? Who uses it, where, and how often?
  • Pin down constraints: Target price, dimensions, mass, environment (IP rating needs? Chemical exposure? Temperature?), compliance market (UK/EU/US), and any service lifetime requirements.
  • Success criteria: Measurable performance targets (strength, accuracy, battery life), plus manufacturability goals.
  • Early risks: Note any unknowns (tolerances, supplier lead times, electronics complexity) so your prototyping plan tackles them first.

Pro tip: Record assumptions and the test you’ll run to validate each one. This turns the prototype into an experiment, not a guess.


2) Design the Concept (Week 2–6)

Deliverables: System architecture, concept sketches, initial CAD, preliminary BOM.

  • System mapping: Split the product into sub-systems (mechanical, electronics, enclosure, firmware, UX) and define interfaces.
  • Design for Manufacturing (DFM/DFMA) early: Use standard fasteners, minimise part count, design for assembly, plan datum schemes for inspection.
  • Tolerances first: Identify critical-to-function dimensions; design adjustability or shims where needed.
  • Electronics & firmware: Select COTS modules where possible for speed; define update/debug pathways from day one.

Where Attwood PD helps: Rapid CAD exploration, DFM reviews, and early fixture/assembly strategy so ideas remain practical for UK supply chains.


3) Choose Materials and Processes (Week 3–6)

Goal: Match material–process–volume to function and budget, with a pathway to scale.

Common Material Choices

  • Plastics: ABS, PC, Nylon (PA12/PA6), PP, PEEK for higher temperature, TPU for elastomeric parts.
  • Metals: Aluminium (6061/6082/7075), Stainless (304/316), Mild steel, Brass, Copper alloys, Titanium for high strength-to-weight.

Rapid Prototyping Processes (UK)

  • 3D Printing: SLA (appearance, smooth surfaces), SLS/MJF (tough nylon, functional hinges), FDM (quick, economical), DMLS/SLM (metal). Great for fast iterations on geometry.
  • CNC Machining: Tight tolerances in plastics and metals; excellent for functional and test-rig parts. Ideal when you need production-representative strength and finish.
  • Vacuum Casting (PU): Low-volume plastic parts from silicone moulds; good for looks-like/works-like sets.
  • Sheet Metal Fabrication: Brackets, enclosures, and frames with rapid lead times.
  • Bridge Tooling for Injection Moulding: Aluminium tools for 50–10,000 shots—useful to validate design, materials, and assembly before steel tooling.

Attwood PD advantage: We combine rapid prototypes (3D printing, CNC, vac-cast) with low- to high-volume production (bridge tooling, CNC, injection moulding) across plastics and metals—so your prototype isn’t a dead end; it’s a production pathway.


4) Build a Looks-Like/Works-Like Prototype (Week 6–10)

Deliverables: Assembled prototype(s), test plan, test fixtures.

  • Looks-like (LL): Prioritise surface quality, colour, and ergonomics for stakeholder buy-in.
  • Works-like (WL): Prioritise strength, tolerances, heat, vibration, ingress; use CNC machined parts or functional 3D prints as appropriate.
  • Combine when possible: A single prototype can be both LL and WL; budget for 2–3 loops of refinement.
  • Fixtures & jigs: Design simple test rigs to generate consistent data.

Inspection & finish options: Bead-blast, anodise (Al), passivate (SS), media tumble, paint, texture, laser marking; metrology via CMM, optical scanners, or gauges.


5) Test, Learn, Iterate (Week 8–14)

Deliverables: Test report, design updates, updated CAD/BOM, revised risk log.

  • Form–Fit–Function (FFF): Check ergonomics, assembly sequence, clearances, cable routing.
  • Environmental & durability: Thermal cycling, drop/impact, chemical exposure, ingress tests (IP pre-checks).
  • Regulatory direction: Align with the intended market (e.g., UK regulations—potentially UKCA—and/or EU CE, depending on where you’ll sell). Capture evidence and traceability early; plan for accredited testing later.
  • Design changes: Incorporate findings into the next revision; lock interfaces before committing to tooling.

6) Plan Your Route to Production (Week 12–20)

Deliverables: Pilot build plan, quality plan, supplier shortlist, unit economics.

  • Volumes & break-evens: Decide between CNC (flexible, low tooling), vacuum cast (bridge), or injection moulding (higher up-front, lowest unit cost at scale).
  • Supply chain: Prioritise UK suppliers for speed, communication, and IP protection; blend with global sources where strategic.
  • Quality: Define CTQs (critical-to-quality), sampling plans, and incoming inspection methods.
  • Documentation: ECO process, part drawings with GD&T, assembly instructions, test procedures.

Attwood PD production services: Low-volume machining and moulding for pilot runs, then scaling to higher volumes with robust tooling and QC—keeping the same engineering team engaged throughout for continuity.


7) Typical Timelines & Budget Bands (Guide)

Actuals depend on complexity, part count, and compliance scope.

Stage Fast-Track (wks) Typical (wks) Budget Range (ex-VAT)
Discovery & scoping 1–2 2–4 £2k–£8k
Concept & architecture 2–3 3–6 £5k–£20k
Detailed design (DFM) 2–4 4–8 £8k–£40k
Prototyping loop (LL/WL) 2–4 4–8 £3k–£25k+ per loop
Pilot build (10–200 units) 3–6 6–10 £8k–£60k+
Production set-up 4–8 8–16 Tooling varies widely

8) Method Selector: What’s Best When?

Need Best Fit Why
Fast geometry checks SLA / FDM 3D printing Speed and low cost for early form & fit
Tough functional nylon parts SLS / MJF Hinges, clips, living joints; good impact resistance
Metal strength & thermal properties CNC / DMLS Production-representative properties
Production-like plastic surfaces Vacuum casting Great for short runs with colour/transparency
Tight tolerances & robust parts CNC machining Accuracy, finish options, wide material choice
Lowest unit cost at scale Injection moulding Ideal from hundreds to millions of parts

9) Avoid These Common Pitfalls

  • Late DFM: Changing wall thickness or draft after tooling is expensive. Bake in DFM from the start.
  • Ambiguous tolerances: Over-tightening raises costs; under-specifying causes failures. Tie tolerances to function.
  • Ignoring assembly: Design for the technician: tool access, poka-yoke features, cable relief, fastener standardisation.
  • Unvalidated adhesives/finishes: Always test on real materials; surface prep matters.
  • Skipping pilot builds: Early production runs expose supply-chain and assembly issues you won’t see in one-offs.

10) How Attwood PD Accelerates Concept-to-Prototype in the UK

  • One partner from CAD to capacity: 3D printing, CNC (plastic & metal), vacuum casting, and injection moulding—plus finishing and QC—under a single UK programme plan.
  • Speed with foresight: Rapid iterations that preserve a clear route to small batch and then high-volume production.
  • Material guidance: Practical trade-offs on impact resistance, temperature, chemical exposure, and cost.
  • Manufacturing-grade prototypes: Production-representative parts so your tests map cleanly to real-world performance.
  • Transparent costs & lead times: Clear, staged quotes and sensible risk-reduction checkpoints.

Why this matters: Competitors with deep content libraries set expectations for thorough guidance. Attwood PD’s approach blends that clarity with hands-on UK manufacturing routes and responsive iteration.


11) Your Step-by-Step Checklist

  1. Define success metrics, constraints, and top risks.
  2. Lock a system architecture and interfaces.
  3. Select material–process pairs aligned to function and volume.
  4. Build LL/WL prototypes and test against metrics.
  5. Iterate; fix CTQs and GD&T before tooling.
  6. Plan pilot build with UK suppliers and QC.
  7. Scale to volume with validated processes and documentation.

12) Ready to Move from Concept to Prototype in the UK?

Share your CAD (or even a sketch) and target use-case. We’ll respond with a practical plan, indicative costs, and lead-time options for 3D printing, CNC machining, vacuum casting, or bridge tooling—plus the fastest route to low-volume production.

Posted in  
Custom Manufacturing